3,中石化天津石化焦化放空塔酸性水除油除焦粉成套装置,规模55t/h。2023年6月投入运行,2023年11月成功完成验收。 Tianjin Branch of Sinopec, Remove oil and coke from the sour water, The capacity is 55t/h. Start up in June of 2023, and performance accept in November of 2023.
|
|
4,山东滨州某炼化公司焦化放空塔酸性水除油除焦粉成套装置,规模20t/h。2024年9月投入运行,2024年5月成功完成验收。 Shandong Bingzhou Refining Coke plant , Remove oil and coke from the sour water, The capacity is 20t/h. Start up in September of 2023, and performance accept in May of 2025.
|